SPG DRY COOLING
2019
Upgrade of Air Cooled Condenser Fans in ALBA PS4
Industry: Power Generation
Client: SPG
Type of Work: Maintenance & Upgrade Without Shutting Down Plant
SPG DRY COOLING
2018
Duct Fabrication & Painting
Industry: Power Generation
Client: SPG
Type of Work: Duct Fabrication & Painting
ALBA PS5 COMBINED CYCLE POWER PLANT PROJECT
2017
Air Cooled Condenser Installation Works
Industry: Power Generation
Client: Gama power systems
Type of Work: Erection, Testing & Painting
ALBA PS5 COMBINED CYCLE POWER PLANT PROJECT
2017
Mechanical works
Gas Turbine – 3 x GE-9HA
Gas Reducing Station
Gas Turbine Building
Steam Turbine – 3 x STF
Gas Turbine Building
Industry: Power Generation
Client: Gama Power Systems
Type of Work: Mechanical Works
ALBA PS5 COMBINED CYCLE POWER PLANT PROJECT
2017
Field Erected Tanks Installation Works
Industry: Power Generation
Client: Gama power systems
Type of Work: EPC
ALBA PS5 COMBINED CYCLE POWER PLANT PROJECT
2017
Acc duct pre-fabrication works
Industry: Power Generation
Client: Gama power systems
Type of Work: Acc Duct Pre-Fabrication